PROJECT COMPLETED

Television Centre

  • ClientStanhope
  • Duration 2014 to 2016

Our scope of works included soft strip, asbestos, demolition of the central wedge area, Studios 4, 5, 6 and 7, the restaurant block, the drama block, including two 40 metre chimney stacks and the deconstruction of three link bridge structures. On completion of the studio structures McGee was awarded a groundworks package which included installing a 150-metre perimeter sheet pile wall and perimeter ring road hard standing road.

Project Related News

Contact Us
Print Page
Print Friendly
Email Page

Services covered

  • Decontamination
  • Demolition
  • Civil Engineering

Market

  • Residential
  • Commercial