UCLH Phases 1 & 2

The scope of works involve the excavation and disposal of approximately 55,000m3 of material from basements verying in depth ranges of 1.50m to 10m deep, together with the supply and installation of 360 tonnes of temporary steelwork and associated retaining walls.