McGee

Paternoster Square

Works consisted of; hoarding erection and site set up, asbestos survey and strip of site, complete soft strip, erection of perimeter scaffold and fans, demolition of all structures and basements, removal of all hazardous substances, creation of remote controlled excavator, controlled demolition of upper structures, major demolition with mid-reach excavators, removal of major ground obstructions, design and installation of basement propping and the processing and recycling of arisings.