HM Treasury Whitehall

The total refurbishment of HM Treasury in Whitehall was carried out in two phases (east & west). The first phase was executed as a traditional top down cut and carve package. This was completed utilising the existing installation of significant temporary works and dead shoring, designed and installed by McGee. A reconstruction of the cores and the main vertical elements was then achieved using a bottom up construction method.