McGee

BBC Broadcasting House

The works undertaken comprised; deep pile probing, the installation of heavy sheet, secant and foundation piles and the excavation of a basement some 45,000 cubic metres in volume and 18 metres deep. We used an open dig excavation including; installation of 3 levels of probbing with substantial gantries and bridges (circa 1000t of temporary steel was used)